| FILE 2510/49836 | ![]() |
![]() |
![]() |
![]() |
|
|||
|
| File information | |
| Filename: | bt-0262-d.jpg |
| Album name: | jimwestp / Main |
| Keywords: | hotel / construction / Marriott / Hotel / downtown / luxury / hotel / building / architecture / building / trades / job / worker / construction / worker / Water / Square / high / rise / crane / construction / crane / Detroit / Michigan / USA / United / States / America / vertical |
| Filesize: | 48 KiB |
| Date added: | Jul 02, 2025 |
| Dimensions: | 200 x 300 pixels |
| Displayed: | 2 times |
| Image Description: | Detroit, Michigan - Construction of the 25-story JW Marriott Detroit Water Square hotel. The framework for a new floor is lowered into place; cement will then be poured over it. |
| IPTC Copyright: | Copyright © Jim West |
| IPTC Keywords: | hotel construction Marriott Hotel downtown luxury hotel building architecture building trades job worker construction worker Water Square high rise crane construction crane Detroit Michigan USA United States America vertical |
| URL: | http://jimwestphoto.com/gallery/displayimage.php?pid=47590 |
| Favorites: | Add to Favorites |